Posts Tagged ‘boiler bed removal tool’

CCS Cleans Recovery Boiler Floor with 180gpm Hyrdroblaster

June 26th, 2013

Applying new technologies in hydroblasting and hydroblasting equipment, CCS operated a 10,000psi hydroblaster that employs 180 gallons per minute at 1,100 horse power to remove a recovery boiler smelt bed with an area of almost 1,200 square feet.  The boiler bed removal tool performed the majority of the task without personnel entering the boiler.

The hydroblasting equipment greatly reduced the hours necessary for boiler floor cleaning.  CCS personnel made entry into the boiler only at the completion of the task for minimal man hours of touch up work and provided a fast turn-around for the facility.  CCS utilizes the latest hydroblast technologies, expertise and knowledge to complete jobs such as this one efficiently and to the customer’s satisfaction.

CCS is a Pacific Northwest area provider of industrial, environmental remediation, hazardous waste management, and emergency response services with locations in Longview, Aberdeen and Port Angeles, Washington as well as Portland and Eugene, Oregon.  24-hour services and equipment include vacuum trucks, hydroblasters, street sweeping,  land and marine spill response, hazardous waste transportation and disposal, tank cleaning, sewer and line cleaning, storm water services, tanker trucks, hydro-excavation, boiler floor cleaning, confined space rescue, UST cleaning and decommissioning, HAZWOPER safety training, and more.